PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued fireproofing the 1st Floor Facing West (800x600) (2).jpg Continued Fireproofing the 1st Floor Facing West (800x600).jpg Continued welding the remaining tube steels at the top of the main steel column Facing South(800x600).jpg Gas piping at the 4th Floor Facing North  (800x600).jpg Installing rebar-wire mesh at the lower roof Facing South (800x600).jpg Installing the main sprinkler pipe at the 1st floor Facing North-East (800x600).jpg Welded clips at the 2nd floor Facing East (800x600).jpg
Previous pageNext page Continued welding the remaining tube steels at the top of the main steel column Facing South(800x600)
Continued welding the remaining tube steels at the top of the main steel column Facing South(800x600)